SyncAlarm
Synchronizes the alarm database.
Function
| Group
| Execution
| Windows
| Embedded
| Thin Client
| Mobile Access
|
SyncAlarm | Database/ERP
| Asynchronous
| Supported
| Supported
| Executed on Server
| Executed on Server
|
Syntax
SyncAlarm( optStrStartDate, optStrEndDate )
- optStrStartDate
- String with the start date. If this parameter is not specified, then the current date is used.
- optStrEndDate
- String with the end date. If this parameter is not specified, then the function uses the same as the start date.
Returned value
Value
| Description
|
1
| Fail to start synchronization; the database is probably being synchronized.
|
0
| Success
|
-1
| Invalid group number
|
-2
| The format is not set to “Database”.
|
-4
| Start date specified is invalid.
|
-5
| End date specified is invalid.
|
-6
| Start date is greater than the end date.
|
Notes
This function is executed asynchronously, so it doesn’t return the result of the synchronization. To get that information, use the SyncAlarmStatus function.
Examples
Tag Name
| Expression
|
Tag
| SyncAlarm() // Synchronizes the database using the current date
|
Tag
| SyncAlarm(“10/20/2004″) // Synchronizes the database only for the day 10/20/2004
|
Tag
| SyncAlarm(“10/20/2004″, “10/28/2004″) // Synchronizes the database from 10/20/2004 to 10/28/2004
|
SyncAlarm